brett logo
  • 0845 608 0570
  • landscaping@brett.co.uk
  • Gardens
  • Drives
  • Commercial
  • Where to Buy
  • Approved Installers
  • Brochure
  • Gallery
  • About Us
  • How to Lay a Patio
  • How to Lay a Driveway
    • Step 1 : Site Preparation
    • Step 2 : Edge Restraints
    • Step 3: The Sub-Base
    • Step 4 : Installation
    • Step 5 : Finishing
  • Home
  • How to Guides
  •  > 
  • How to Lay a Driveway

Step 3 : The Sub-Base

Further to your specific requirements, apply the sub-base of MOT Type 1 with the rake and thoroughly compact using the vibrating plate in layers of 50mm until your desired level is reached.

 

Apply a 50mm level of slightly damp, course sharp sand and compact down, again using the vibrating plates, to an approximate depth of 35mm.

 

A further 20mm layer of sharp sand then needs to be raked on top and using the screeding rails and string line, leveled to the correct falls.

 

When using vibrating plate machinery please follow all manufacturer's guidelines including acceptable levels of exposure and in particular use ear protection.

 

To download your Full How to Lay a Driveway Guide, click here.

  • Step 4 : Installation

    More
  • Contact us
  • Site map
  • Terms & Conditions
  • Useful Links

© Brett 2012 All rights reserved.

  • Natural Stone
  • Garden Paving
  • Walling
  • Garden Edging
  • Gravels & Chippings
  • Block Paving
  • Permeable Paving
  • Kerbs
  • Drainage & Edgings
  • Joint Fillers
  • Permeable Solutions
  • Machine Lay Paving
  • Trief Containment Kerb
  • Kassel Access Kerbs
  • Specialised Aggregates
  • Where to Buy
  • Find an Installer
  • Approved Installers
  • Brochure Request
  • Water Management
  • The Brett Group
  • About Brett Landscaping
  • Support & Services
  • Corporate Social Responsibility
  • Sustainability