brett logo
  • 0845 608 0570
  • landscaping@brett.co.uk
  • Gardens
  • Drives
  • Commercial
  • Where to Buy
  • Approved Installers
  • Brochure
  • Gallery
  • About Us
  • How to Lay a Patio
  • How to Lay a Driveway
    • Step 1 : Site Preparation
    • Step 2 : Edge Restraints
    • Step 3: The Sub-Base
    • Step 4 : Installation
    • Step 5 : Finishing
  • Home
  • How to Guides
  •  > 
  • How to Lay a Driveway

Step 5 : Finishing

Using the yard broom, brush the kiln dried into all of the joints and thoroughly compact, again using the vibrating plate, ensuring that all of the blocks are at the desired finished level.

 

Subsequently top the sand and re-compact to ensure that no joints are left unfilled.

 

Please note, if you are using Brett Aura or Classico range of paving blocks the Brett Permeable Chippings need to be applied in this finishing process.

 

To download your Full How to Lay a Driveway Guide, click here.

  • Contact us
  • Site map
  • Terms & Conditions
  • Useful Links

© Brett 2012 All rights reserved.

  • Natural Stone
  • Garden Paving
  • Walling
  • Garden Edging
  • Gravels & Chippings
  • Block Paving
  • Permeable Paving
  • Kerbs
  • Drainage & Edgings
  • Joint Fillers
  • Permeable Solutions
  • Machine Lay Paving
  • Trief Containment Kerb
  • Kassel Access Kerbs
  • Specialised Aggregates
  • Where to Buy
  • Find an Installer
  • Approved Installers
  • Brochure Request
  • Water Management
  • The Brett Group
  • About Brett Landscaping
  • Support & Services
  • Corporate Social Responsibility
  • Sustainability