brett logo
  • 0845 608 0570
  • landscaping@brett.co.uk
  • Gardens
  • Drives
  • Commercial
  • Where to Buy
  • Approved Installers
  • Brochure
  • Gallery
  • About Us
  • How to Lay a Patio
  • How to Lay a Driveway
    • Step 1 : Site Preparation
    • Step 2 : Edge Restraints
    • Step 3: The Sub-Base
    • Step 4 : Installation
    • Step 5 : Finishing
  • Home
  • How to Guides
  •  > 
  • How to Lay a Driveway

Step 2 : Edge Restraints

When preparing mix, please avoid direct handling of cement, always cover your skin.

 

Using the cement mixer, mix 1 part cement and 6 parts ballast to create a concrete foundation for the edge restraint that's 100mm thick, while ensuring that the edge restraint unit to be placed on the foundation will sit at the required finished level using the string line and spirit level.

 

The edge restraint unit can either be a kerb unit of a thick paving block (at least 60mm). Mortar these units to the foundation using the trowel and rubber mallet and again using the concrete, form a haunch up at least half the block height.

 

To download your Full How to Lay a Driveway Guide, click here.

  • Step 3 : The Sub-Base

    More
  • Contact us
  • Site map
  • Terms & Conditions
  • Useful Links

© Brett 2012 All rights reserved.

  • Natural Stone
  • Garden Paving
  • Walling
  • Garden Edging
  • Gravels & Chippings
  • Block Paving
  • Permeable Paving
  • Kerbs
  • Drainage & Edgings
  • Joint Fillers
  • Permeable Solutions
  • Machine Lay Paving
  • Trief Containment Kerb
  • Kassel Access Kerbs
  • Specialised Aggregates
  • Where to Buy
  • Find an Installer
  • Approved Installers
  • Brochure Request
  • Water Management
  • The Brett Group
  • About Brett Landscaping
  • Support & Services
  • Corporate Social Responsibility
  • Sustainability