brett logo
  • 0845 608 0570
  • landscaping@brett.co.uk
  • Gardens
  • Drives
  • Commercial
  • Where to Buy
  • Approved Installers
  • Brochure
  • Gallery
  • About Us
  • How to Lay a Patio
    • Step 1: Site Preparation
    • Step 2: The Sub-Base
    • Step 3: Preparing the Mix
    • Step 4: Laying the Paving
    • Step 5: Cutting
    • Step 6: Pointing
  • How to Lay a Driveway
  • Home
  • How to Guides
  •  > 
  • How to Lay a Patio

Step 2: The Sub-Base

Apply the sub-base of MOT Type 1 with the rake and thoroughly compact using the vibrating plate to minimum thickness of 75mm.

 

When using the vibrating plate machinery please follow all manufacturer's guidelines including acceptable levels of exposure and in particular use ear protection

 

To download your Full How to Lay a Patio Guide, click here.

  • Step 3: Preparing the Mix

    More
  • Contact us
  • Site map
  • Terms & Conditions
  • Useful Links

© Brett 2012 All rights reserved.

  • Natural Stone
  • Garden Paving
  • Walling
  • Garden Edging
  • Gravels & Chippings
  • Block Paving
  • Permeable Paving
  • Kerbs
  • Drainage & Edgings
  • Joint Fillers
  • Permeable Solutions
  • Machine Lay Paving
  • Trief Containment Kerb
  • Kassel Access Kerbs
  • Specialised Aggregates
  • Where to Buy
  • Find an Installer
  • Approved Installers
  • Brochure Request
  • Water Management
  • The Brett Group
  • About Brett Landscaping
  • Support & Services
  • Corporate Social Responsibility
  • Sustainability