Step 6: Pointing 

Remember to avoid direct handling of cement, always cover your skin.

 

Using the shovel and trowel, prepare a pointing mix of 4 parts washed sharp sand, 1 part cement and water to a damp, not wet, even consistency.

 

Firm it into the joints using the trowel and finish with the pointing tool called a 'smoothing iron' (or a piece of copper pipe).

 

Carefully remove any excess pointing material using the trowel and yard broom, ensuring no residue is left on the slab surface.

 

Other chemical jointing compounds are available, contact our Technical Advice Team on 0845 608 0577 for more information.

 

 Hints & Tips

Clean mortar spillage immediately to prevent staining and if possible joints should be pointed on a dry day.


To download your Full How to Lay a Patio Guide, click here.

  • Contact us
  • Site map
  • Terms & Conditions
  • Useful Links

© Brett 2012 All rights reserved.

  • Natural Stone
  • Garden Paving
  • Walling
  • Garden Edging
  • Gravels & Chippings
  • Block Paving
  • Permeable Paving
  • Kerbs
  • Drainage & Edgings
  • Joint Fillers
  • Permeable Solutions
  • Machine Lay Paving
  • Trief Containment Kerb
  • Kassel Access Kerbs
  • Specialised Aggregates
  • Where to Buy
  • Find an Installer
  • Approved Installers
  • Brochure Request
  • Water Management
  • The Brett Group
  • About Brett Landscaping
  • Support & Services
  • Corporate Social Responsibility
  • Sustainability