Remember when lifting and carrying paving units always consider the weight before attempting to lift. If it is heavy, get help. Take care not to trap fingers whilst handling paving units.
Gently lower the slab down onto the mortar bed and always tapping in the centre of the slab; use a rubber mallet to position it at the required finished level.
Also ensure that the mortar bed underneath is no greater than 50mm.
Repeat this process using the string line and spirit level to maintain the appropriate drainage slope.
Check that no edges are standing up proud simply by running your hand over the joints. Ensure consistent gaps, ideally of 10-15mm between the slabs.
Leave the slabs for at least 2 days so that the sand cement mix can set.
Hints & TipsWe also recommend that paving be selected from different packs as it is being laid to ensure an even colour mix.